St. Maarten, Carribean
Owner: Beacon Investment Management Group
Construction Cost: $35 Million
Completion Date: TBD
Square Feet: 90,000 sqft Main Building
A new 200 room Hilton Hotel Property on St. Maarten Island in the Caribbean. Property includes a spa, fitness center, meeting rooms, and three restaurants on the nine acre bay site
|
|

 |
Carrollton, Georgia
Owner: Dr. Stephen H. Kahler
Construction Cost: TBD
Completion Date: Fall 2009
Square Feet: 5,500
As the Architect of Record, the project was realized based on the design provided by the New York office of Nicole Migeon Architects. A new 5,000 square feet medical spa located on the outskirts of Atlanta overlooking a natural ravine. The building orients itself away from the adjacent commercial shopping center and into the natural ravine with a small creek. The project includes a green roof, slat screens and full height glazing system with a cantilever structural system.
|
|
 |
Jacksonville, Florida
Owner:Joint venture of Beazer and ICI
Construction Cost: TBD
Completion Date: TBD
Square Feet: 14,000
Master planning of a 12 acre parcel was recently completed on a new Tuscan style amenity center building for the new Tamaya residential community of 1,200 homes. Planned activities include, an adult pool with grotto like elements, a children's pool with a large 2 person water slide and adjacent lazy river, tot pool, tennis complex and much more.
|
|

 |
Tellico Plains, Tennesse
Owner: Murtaugh Companies, Inc.
Construction Cost: TBD
Completion Date: Fall 2011
Square Feet: 53 Units, approximately 24,000 sqft.
Master planning a new Village style community, including the initial development of a Microtel Inn and Suites. Various amenities planned for this location include event lawns, signature retail anchors, outdoor walking retail/restaurants and a mid-range multistory full service hotel.
|
|
 |
Jacksonville, Florida
Owner:Orange Park Kennel Clubs
Construction Cost: 1.5million
Completion Date: Summer 2008
Square Feet: 32,000
The complete renovation of the second floor of the
existing Kennel Club allowed us to add a new 50
table poker room.
A new, relocated main kitchen with a satellite sushi
bar was also planned.
The balance of the area was divided up into offices
and support areas for the new gaming function.
|
|

|
Ponte Vedra Beach, Florida
Owner: Gate Petroleum
Construction Cost: Undisclosed
Completion Date: Ongoing (1998-Present)
Square Feet: ...
The scope of work includes guest room renovations and an addition to the fitness center, including addition of 2 new presidential suites. Renovation of the lobby, bar and restaurant and various exterior renovations.
|
|

 |
Ponte Vedra Beach, Florida
Owner: Gate Petroleum
Construction Cost: Undisclosed
Completion Date: 2006
Square Feet: 28,000
The existing spa was replaced with a new, larger facility. The new 28,000 square foot building has a 28 foot long ceiling, 22 treatment rooms including 2 couple or VIP rooms, a large pool deck which overlooks a therapy pool with five unique water treatment grottos.
|
|



 |
Julington Creek, Florida
Owner: Gate Petroleum
Construction Cost: Undisclosed
Completion Date: 2006
Square Feet: 10,000
The new full service 10,000 square foot day spa includes 10 treatment rooms, a couples therapy suite, central relaxation room, shop and yoga studio. The modern decor provides an aesthetic contrast to the historical riverfront community.
|
|

|
Ponte Vedra Beach, Florida
Owner: Gate Petroleum
Construction Cost: $60,000,000
Completion Date: Ongoing (1999-present)
Square Feet: ...
The architect was commissioned to design a significant upgrade to this premier 5-Star beach, golf and tennis resort in Ponte Vedra Beach, Florida. Multi-phased implementation has included, and will include in the future:
1997 Master Planning
1999 Phase I
250-car Parking Structure (including central laundry, central warehouse, Central cart storage, central plant)
Golf Clubhouse Renovation
New ellipse and enhanced landscaping
2000 Phase II
New Administration Building (temporary main lobby)
2001 Phase III
The New Inn (including retail, main lobby)
Central Fountain and Entry Landscape
Historic Inn Renovations
Surf Club Renovations
New Fitness Center
2002 Phase IV
New Florida Room
St. Johns House Renovations
2003 Phase V
Island House cottages
2004 Phase VI
Boulevard Landscape / Entry Gateways
Tennis Center Renovation
2005 Spa Expansion
Peyton House Renovations
|
|

 |
Ponte Vedra Beach, Florida
Owner: Plantation
Construction Cost: 7.5 million
Completion Date: unbuilt
Square Feet: 15,000
Master planned renovations of existing facilities including Dining Rooms, Meeting Rooms and Locker Rooms. The plan also included a proposed new Fitness Center, Raquet Club, Golf Pro Shop and renovations to the Grounds and Maintenance facilities.
|
|
 |
Ponte Vedra Beach, Florida
Owner: Gate Petroleum
Construction Cost: Undisclosed
Completion Date: 2003
Square Feet: ...
Starting Phase V – Island House cottages in 2003, 24 luxurious rooms and 4 suites, all overlooking the famous Island 9th golf hole and blue lagoons. It is a 1.3 acre peninsula surrounded by lagoon on three sides.
|
|
 |
Ponte Vedra Beach, Florida
Owner: Gate Petroleum
Construction Cost: $11,000,000
Completion Date: 2000
Square Feet: 26,000
The existing gym was replaced with a new larger facility, with state-of-the-art equipment. All rooms overlook the Atlantic Ocean.
|
|
 |
St. Augustine, Florida
Owner: ...
Construction Cost: ...
Completion Date: ...
Square Feet: ...
This 383 unit resort condominium development is patterned after a village. The architecture is reminiscent of nearby St. Augustine of both the Ponce De Leon hotel and the village fabric. Included are a world class spa and 2 luxury resort pools on two adjacent parcels totaling 38 acres surrounded by the new King and the Bear Golf Course designed by Jack Nicklaus and Arnold Palmer.
|
|


 |
|